Project Gallery

Panatec Corporation SHARP CERTIFIED SOLAR PANEL INSTALLER

1US Army Corps of EngineersAward # W91237-13-P-0132
Location: Beech Fork Lake, West Virginia
Capacity: 50 KW at present
2US Army Corps of EngineersAward # W912QR-12-C-0046
Location: Caesar Creek Lake, Ohio
Capacity: 55 KW at present
Provision to scale 2-3 times in future
3Industrial Complex25+ Total installations in different countries
Capacity: 5 MW
Provision to grow 40 MW in next 3 years
4 U S ArmyUnder review, Ground Mounted System
Location: Inyo, CA
Capacity: 100 KW, Provision to grow 1 MW
Reference: Furnished later
5Residential Systems100+ installations
Total Installation: 1 MW
6Industrial ComplexAhmedabad, India
Capacity: 750 KW
7Commercial Grade Power plantPatan Solar Park – In progress

Capacity 3 MW at present scaled to grow 100 MW in next 5 years

Former President, Bill Clinton, has significantly contributed toward establishment of Patan Solar Park.

Panatec Corporation’s goal is to develop into a public limited solar power producing company in India in next 2 years.

 

Utility Scale Projects

Following is the illustration of our past and current projects.

2 MW Solar Power Plant at Port Au Prince, Haiti

clip_image002

3 MW Ground Mount System – UNIRAC ISYS Foundation

clip_image00

Technical Data
Rated System Power3.0 MW
Annual Energy YieldApprox. 4.5 GWh
Equivalent to the power consumption ofApprox. 400 Families
CO2 Saving p.a.Approx. 1,130 Tons
InverterSMA
Construction StyleGround Mount System
Tilt Angle25 degree
Framing TechnologyUNIRAC
OrientationSouth

1 MW Ground Mount System – Generic Foundations

clip_image003

Technical Data
Rated System Power1.0 MW
Annual Energy YieldApprox. 1.5 GWh
Equivalent to the power consumption ofApprox. 110 Families
CO2 Saving p.a.Approx. 330 Tons
InverterFraunius
Construction StyleGround Mount System
Tilt Angle22 Degree
Framing TechnologyGeneric
OrientationSouth

600 KW Ground Mount System – Generic Foundations

clip_image004

Technical Data
Rated System Power600 KW
Annual Energy YieldApprox. 9 MWh
Equivalent to the power consumption ofApprox. 60 Families
CO2 Saving p.a.Approx. 120 Tons
InverterFraunius
Construction StyleConcrete Ballast
Tilt Angle22 Degree
Framing TechnologyGeneric
OrientationSouth

3 MW Ground Mount System – UNIRAC Framing

clip_image006clip_image005

 

Technical Data
Rated System Power3.0 MW
Annual Energy YieldApprox. 15 MWh
Equivalent to the power consumption ofApprox. 4,200 Families
CO2 Saving p.a.Approx. 3,753 Tons
InverterFraunius
Construction StyleGround Mount System
Tilt Angle25 Degree
Framing TechnologyUNIRAC
OrientationSouth

600 KW Ground Mount System – UNIRAC Framing

clip_image006clip_image005

 

Technical Data
Rated System Power600 KW
Annual Energy YieldApprox. 1 GWh
Equivalent to the power consumption ofApprox. 100 Families
CO2 Saving p.a.Approx. 800 Tons
InverterFronius
Construction StyleGround Mount System
Tilt Angle25 Degree
Framing TechnologyUNIRAC
OrientationSouth

US Government Projects

clip_image008clip_image008

Technical Data
Rated System Power50 KW
Annual Energy YieldApprox. 500 MWh
Equivalent to the power consumption ofApprox. 10 Families
CO2 Saving p.a.Approx. 50 Tons
InverterFronius
Construction StyleGround Mount System
Tilt Angle30 Degree
Framing TechnologyMicro Piles
OrientationSouth
clip_image008clip_image009

 

Technical Data
Rated System Power100 KW
Annual Energy YieldApprox. 1800 MWh
Equivalent to the power consumption ofApprox. 18 Families
CO2 Saving p.a.Approx. 100 Tons
InverterFronius
Construction StyleRoof Mount System
Tilt Angle25 Degree
Framing TechnologyS-5
OrientationSouth

Residential and commercial systems

Asia’s Largest Solar Park

clip_image1clip_image2

 

 

 

 

 

 

6 KW Residential location in NJ

clip_image3
 

 

 

7 KW Residential location in NJ

clip_image4

7 KW Residential location in NJ

clip_image5
 

10 KW Residential location in NJ

clip_image6

 

 

 

 

 

 

 

 

10 KW Residential location in NJ

clip_image7clip_image8

 

 

 

 

10 KW Residential location

clip_image9

Leave a Reply

Your email address will not be published. Required fields are marked *