Installation Process

•    Is it difficult to switch over to solar power?

No. Panatec makes it easy to switch to solar. We will get your solar system up and running as quickly and smoothly as possible so that you can start saving money and using clean energy. You won’t experience any changes inside your home or business.

Back to Top

•    How long will it take to get my new solar system up and running?

A typical solar panel installation takes about 3-5 days and a typical commercial installation takes about 1-3 weeks from the day we begin the installation. The length of time depends on the complexity of your roof and the number of panels that will be installed. The estimated installation time will be included in the design proposal presented to you by Panatec.

Back to Top

•    What kind of permits are needed to meet local building codes?

As part of our comprehensive service, Panatec will obtain all building permits and design your system to meet your local building codes. We’ll arrange the electrical, building and utility inspections and be on-site to make sure that everything is up to code. Panatec takes care of your project every step of the way.

Back to Top

•    What if my roof needs repairs after I’ve installed solar panels?

Ideally, you should install solar panels on a roof that is in good condition. When a Panatec site auditor comes out to inspect your building prior to installation, he or she will check to make sure that your roof is suitable for a solar installation. Once the solar panels are installed, they actually help to protect your roof from the elements. If you should ever need to make repairs on the roof, the solar panels will need to be removed and re-installed. Panatec offers this service for a reasonable fee.

Back to Top

Leave a Reply

Your email address will not be published. Required fields are marked *